TVR ProjectsTVR Projects

Projects

M/S.TVR PROJECTS PRIVATE LIMITED
(FORMERLY VIJAYA ENGINEERS & CONTRACTORS)
VISAKHAPATNAM

LIST OF JOBS BEING EXECUTED:

Client Name
: U.P Jal Vidyut Nigam Limited
Completion /
Duration Period
: JUNE, 1979 TO JULY, 1982
Description
: Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate  Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP.
Client Name : M/S Bhanu Constructions Company
Completion /
Duration Period
: 12th July, 1982
Description : Erection of Sub-Station equipment including cabling and lighting
Client Name : U P Jal Vidyut Nigam Limited
Completion /
Duration Period
: 4 Months Oct, 1981
Description : Overhauling of LT Motors, Condenser Pumps, HT Motors, E.S.P and Rectifier Transformers of E.S.P of OBRA Thermal Power Station UPSEB.
Client Name :  U P Jal Vidyut Nigam Limit
Completion /
Duration Period
: 6 Months June, 1985
Description : Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associated auxiliaries at Rihand Power station UP Jal Vidyut Nigam Ltd. U.P
Client Name : U P Jal Vidyut Nigam Limit
Completion /
Duration Period
: 9 Months
Description : Supply, Dismantling, Rectification and Erection of 22 nos of stop Log Gates at Rihand Hydro Power Station, Pipri, U.P
Client Name :  U P Jal Vidyut Nigam Limit
Completion /
Duration Period
: 90 Days April, 1990
Description : Capital Overhauling of 2 Nos 90 M Tons EOT Crane alignment and leveling RHPS, PIPRI, U.P
Client Name : U.P. Jal Vidyut Nigam Ltd
Completion /
Duration Period
: August, 1988 To July, 1992
Description : Dismantling , Rectification, re-erection of intake Gates re-alignment of Guide Track, cleaning and painting of all 6 Units each 50MW at Rihand Hydro Power Station, PIPRI, U.P. Jal Vidyut Nigam Ltd. UP.
Client Name : U.P. Jal Vidyut Nigam Ltd.
Completion /
Duration Period
: 6 Months
Description : Dismantling, Overhauling special Rectification of Unit No.3 and 12 Nos of Stop Log Gates at Obra Hydel Power house, OBRA, U.P. Jal Vidyut Nigam Ltd. UP.
Client Name : Tamilnadu Electricity Board Ennore, Chennai
Completion /
Duration Period
: 3 Months February, 1999
Description : E T P S- Turbine Division-Dismantling, Rectification and Re-erection of 2 Nos Boiler Feed Pump of Unit-V, 110 MW
Client Name : Utter Pradesh Jal Vidyut Nigam Limited,
Completion /
Duration Period
: 25 Days 30.06.2000
Description : Re-alignment of Rails and Overhauling of 90 x 2 MT E.O.T Crane at Rihand Power Station, PIPRI Sonebhadra Dist., U.P.
Client Name : U.P J V N Limited Obra
Completion /
Duration Period
: 90 Days May,2000
Description : Dismantling, Rectification/Overhauling and Re-erection of , Boiler Feed Pumps 2 Nos & its Auxiliaries for Unit No.8 of 200 Mw at Obra Thermal Power station, UP J V N Limited
OBRA
Client Name : U.P J V N Limited PIPRI
Completion /
Duration Period
: 3 Months Sept., 2000
Description : Capital Overhauling of Unit No.4 (50 MW English Electric Make) Turbine Generator and its Auxiliaries at Rihand Hydro Power Station, PIPRI, U.P
Client Name : UP J V N Limited PIPRI
Completion /
Duration Period
: 90 Days October,2000
Description : Dismantling, Rectification and re-assembly of intake gate of Machine No.4 & Changing of Rubber Seals of 22 Nos Stop Log Gates and dropping them in “C” guides of Unit No.4
Client Name : UP J V N Limited PIPRI
Completion /
Duration Period
: 3 Months October, 2000
Description : Overhauling of 60 MVA Transformer and Overhauling of 100 MT Gantry Crane on DAM TOP including re-alignment of Rails etc, at Rihand Hydro Power Station PIPRI, Dist Sonebhadra
Utter Pradesh
Client Name : WEIR Pumps Limited U.K
Completion /
Duration Period
: One Month April, 2002
Description : Manufacture and Supply of OFF-SKID, Pipes for Unit No.3 & 4 of Tarapur Atomic Power Project, Tarapur, Maharastra State
Client Name : U.P.Jal Vidyut Nigam Limited
Completion /
Duration Period
: 20 Days February, 2002
Description : Dismantling and lifting of Generator Shaft of Machine No.4 from its coupling after properly wedging the runner of the turbine and keeping the same at Unit No.4 of RPS, PIPRI, U.P
Client Name : U.P.Jal Vidyut Nigam Limited
Completion /
Duration Period
: 70 Days March, 2002
Description : Repairing of 6 Nos. Draft Tube gates and fixing of Rubber Seals (supplied by department) on gates as per specification complete in all respect at RPS, Pipri, U.P
Client Name : Dolphin Engg.Enterprise
Completion /
Duration Period
: August, 2003 To December 2003
Description : RCC Structures, RCC Basin, Stair Case, supply of materials, labour & construct8ion of 3 cell RCC COOLING Tower of M/s.Konark Power project Limited, Tumukuru, Karnataka State
Client Name : RINL Visakhapatnam
Completion /
Duration Period
: March, 2009 to May, 2009
Description : Erection ,Testing & Commissioning of External and internal Electrification works for Agro forestry building Complex at Ukkunagaram in Visakhapatnam Steel Plant
Client Name : RINL Visakhapatnam
Completion /
Duration Period
: Nov, 2009 to JAN, 2010
Description : Installation, Testing & Commissioning to all equipment for Power Wiring For Access Control System at
Expansion Gate in Visakhapatnam Steel Plant
Client Name : C & S Bangalore
Completion /
Duration Period
: March, 2006 To May, 2006
Description : Erection of BTS AT Seabird Project,Karwar, Karnataka
Client Name : WEIR Engg. Services (i) Ltd.
Completion /
Duration Period
: Autust,2002 To December, 2005
Description : Erection of the boiler Feed Pump (with Motor) units along with auxiliary equipments at NPCIL, Tarapur Unit no.3
Client Name : Euro Coke & Energy Pvt. Ltd.,
Completion /
Duration Period
: June, 2004 To December,2005
Description : Supply and Erection of Electrical equipment, instrumentation and automation package for the Coke Oven Plant at, Jindal Vijayanagar Steels, Toranagallu, Bellary Dist. Karnataka State
Client Name : Hycon Infrastructure Ltd
Completion /
Duration Period
: Sept. 2004 to August, 2005
Description : Providing lighting along Road including Parks at Visakhapatnam to Bheemili Beach Road for VUDA Visakhapatnam
Project Name
:
Tata Teleservices Limited
Completion /
Duration Period
:
6 Months May, 2001 To October, 2001
Description
:
Civil, Electrical, Power implementation Cable trays and Poles for Antena works for Limited Mobility Site & Concentrator Site works at Visakhapatnam, Kakinada, Rajahmundry of AP
Project Name
:
TTL Hyderabad
Completion /
Duration Period
:
Sept, 2005 to May, 2006
Description
:
Provision of infrastructure facilities for Cell sites and repeater sites in A.P
Project Name
:
Reliance Engineering Associates Pvt Limited HYDERABAD
Completion /
Duration Period
:
60 Days March, 2001
Description
:

Trenching and laying of Ducts for Hyderabad city net work

Client Name
: Visakhapatnam Steel Project
Completion /
Duration Period
:
4 Months February 1983
Description
 :
Supply & installation and Commissioning of industrial Lighting Earthing & lighting Protection for fire Bridged Station of Visakhapatnam Steel Project, A.P
Client Name
: Visakhapatnam Steel Project
Completion /
Duration Period
:
18 Months Novembers,1984
Description
 :
Supply, installation & Commissioning of Power, Lighting and Earthing works. 30 Nos of “D” type, 220 Nos. of “C” type Dwelling Units at Visakhapatnam Steel Project, Andhra Pradesh
Client Name
: Visakhapatnam Steel project
Completion /
Duration Period
:
12 Months June, 1985
Description
:
Erect ion of 11 KV Overhead lines, Sub-station ear things at Visakhapatnam Steel Project, Vizag
Client Name
: Visakhapatnam Steel project
Completion /
Duration Period
:
12 Months June, 1985
Description
:
Erect ion of 11 KV Overhead lines, Sub-station ear things at Visakhapatnam Steel Project, Vizag
Client Name
: B.H.E.L ISG Bangalore
Completion /
Duration Period
:
12 Months August-1989
Description
:
Erection, Testing and Commissioning of Electrical for Twin Boom Stackers & Trailer Unloader at Visakhapatnam Steel Project, Vizag
Client Name
: B.H.E.L ISG Bangalore
Completion /
Duration Period
:
15 Months June, 1989
Description
:
Transportation of the Equipment, erection & Providing Commissioning assistance for the Wire Rod mill Electrics at Vizag Steel Plant
Client Name
: B.H.E.L ISG Bangalore
Completion /
Duration Period
:
7 Months
Description
:
Receipt of material, Transportation Erection and rendering commissioning assistance for the Rail and Structural Mill- MG set replacement Billet and Blooming mill- MG Set Replacement Electrics and Blast Furnace 5 at Bhilai Steel Plant, SAIL, BHILAI, M.P
Client Name
: B.H.E.L ISG
Completion /
Duration Period
:
3 YEARS March 1994
Description
:
Receipt of material from Stores, Transportation of goods to erection site, storage at erection site, safe custody erection and providing required number of skilled personnels for Testing & Commissioning to BHEL Engineers for Assistance till the entire job in completion of MMSM at Visakhapatnam Steel Project, Visakhapatnam A.P
Client Name
: B.H.E.L ISG
Completion /
Duration Period
:
3 YEARS March 1994
Description
:
Erection of Earthing material at Visakhapatnam Steel Project in MMSM Project, Visakhapatnam
Client Name
: B.H.E.L ISG
Completion /
Duration Period
:
6 months March, 1994
Description
:
Labour Charges for Loading unloading and transport of equipment from BHEL Stores to site, Erection, Alignment, Pre-commissioning Traits & Final Commissioning of various Equipments in MMSM VSP, Visakhapatnam
Client Name
: B.H.E.L ISG BANGALORE
Completion /
Duration Period
:
Two Years July, 1996
Description
:
Receipt of Material, Transportation Erection and rendering Commissioning Assistance for the Hot Rolling and Stackel Mill at Salem steel Plant, SAIL, SALEM, Tamilnadu
Client Name
: A.B.B LTD BANGALORE
Completion /
Duration Period
:
3 years December, 1997
Description
:
Receipt of materials, Transportation, Erection and Commissioning of Electrical Equipment including Cable Laying and end Terminations at Continuous Casting Plant-II Rourkela Steel Plant , Rourkela , Orissa
Client Name
: BHEL, ISG, Bangalore
Completion /
Duration Period
:
20 Days November, 1997
Description
:
Revamping of D.C. Motors at Salem Steel Plant, Salem Tamilnadu
Client Name
: ABB LTD BANGALORE
Completion /
Duration Period
:
9 Months December, 1998
Description
:
UNLOADING, SHIFTING, TRANSPORATION & Dismantling, installation, Assistance in testing and commissioning of Electrical for CAL at CRM Project, Rourkela Steel Plant, Rourkela
Client Name
: ABB LTD BANGALORE
Completion /
Duration Period
:
July, 1997 To January, 2000
Description
:
Unloading, Shifting, Transportation & Dismantling, installation, Assistance in Testing and Commissioning of Electrics for Cold Reversing Mill-1 Picking line-II, Coil preparation line and Galvanizing line-1 etc works at Rourkela Steel Plant, SAIL Rourkela, Orissa.
Client Name
: B.H.E.L ISG BangaloreA B B Limited Bangalore
Completion /
Duration Period
:
April, 1999 To September, 2000
Description
:
Unloading, Shifting, Transportation & Dismantling, Installation, Assistance in testing and Commissioning of Electrics for Galvanizing Line-II, E.T.S.L.-II, and CAL etc., and miscellaneous works in CR-I, PL-II, CPL works of Rourkela steel Plant , SAIL Rourkela, Orissa
Client Name
: RINL Vizag
Completion /
Duration Period
:
April, 2006 to September, 2006
Description
:
Supply and Erection of Flood light towers and providing Street light pole form Old Appikonda Gate to New Appikonda gate at Visakhapatnam Steel Plant, Visakhapatnam
Client Name
: RINL Vizag
Completion /
Duration Period
:
March, 2007 to August, 2007
Description
:
Supply and Erection for “Upgradatiion of Electrical Installations at Zonal Site Offices for Additional facilities of 6.3 MT Expansion of Visakhapatnam Steel Plant, Visakhapatnam
Client Name
: RINL VIZAG
Completion /
Duration Period
:
December, 2007 WORK-IN-PROGRESS
Description
:

Design , manufacture, Supply and Erection of Electrics for Gas Booster for fourth Stream in Converter Gas Recovery Plant at Steel Melting Shop of Visakhapatnam Steel Plant

Client Name
: RINL Visakhapatnam
Completion /
Duration Period
:
March, 2009 to May, 2009
Description
:
Erection ,Testing & Commissioning of External and internal Electrification works for Agro forestry building Complex at Ukkunagaram in Visakhapatnam Steel Plant
Client Name
: RINL Visakhapatnam
Completion /
Duration Period
:
March, 2009 to May, 2009
Description
:
Supply of External and internal Electrification works for Agro forestry building Complex at Ukkunagaram in Visakhapatnam Steel Plant
Project Name
: U.P Jal Vidyut Nigam Limited
Completion /
Duration Period
:

JUNE, 1979 TO JULY, 1982

Description
:
Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP.
Project Name
: U.P Jal Vidyut Nigam Limited
Completion /
Duration Period
:

JUNE, 1979 TO JULY, 1982

Description
:
Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP.
Description

:

Supply, Installation and Commissioning of Industrial lighting, earthing and lightening protection for Electrical Equipment of M/S. Andhra Cement Company, Visakhapatnam
Client Name
:
Andhra Cement Company
Completion /
Duration Period
:
25 Months December,1987
Client Name
:
Asea Brown Boveri Limited, Bangalore
Completion /
Duration Period
:
December, 2008 to Work-in-progress
Description
:
Erection and Commissioning services for Dalmia Cements Limited, Ariyalur, Trichi, Tamilnadu State
/div>
Client Name
:
HPCL Vizag
Completion /
Duration Period
:
April, 2006 To Feb, 2007
Description
:
Construction of Restrooms and Toilet facilities at HPCL petrol bunks in Costal Andhra Pradesh
Project Name
: U.P Jal Vidyut Nigam Limited
Completion /
Duration Period
:

JUNE, 1979 TO JULY, 1982

Description
:
Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP.
Project Name
: ABB LTD Pennya Bangalore
Completion /
Duration Period
:
March, 2009 To
Description
:
C&I Erection of SJCL Project
Client Name
: ABB LTD BANGALORE
Completion /
Duration Period
:
One year July, 1994
Description
:
Receipt, Storage, Transportation, Erection & handling over of equipments listed in bill of materials section-1 for Bhilai Steel Plant, Wine Rod Mill revamp project in Bhilai steel plant, SAIL, BHILAI
Client Name : A.B.B LTD BANGALORE
Completion /
Duration Period
: March, 1998 To October, 1998
Reference by : The Senior Manager-ICO ABB LTD Peenya Industrial Area,BANGALORE-
560 058, Karnataka
Description : Transportation of Equipments like 33KV/11KV/6.6KV Power Transformers, HT Panels, sub-station Panel, MCC’s, PCC’s Illumination System, Cable s, structural items and connected equipment / materials etc., from Reliance Petroleum’s Limited, Stores to Erection site at Jamnagar, Gujarat.
Client Name
: A.B.B LTD BANGALORE
Completion /
Duration Period
:
One year December, 1994
Description
:
Erection of Equipments Cable Laying, Terminations and commissioning Assistance of M/s.Panchamahal steel Ltd, at KALOL, Gujarat State
Client Name : BHEL,ISG,Bangalore
Completion /
Duration Period
: March, 2004 To December, 2005
Reference by : Bharat Heavy Electricals Limited, ISG, II Sc Post Prof, C.N.R.Rao Circle Malleswaram BANGALORE
Description : Receipt of Equipments materials spares at KMCL Storage, Erection of Panels, Electrics and control room equipments, rendering commissioning Assistance to BHEL Engineers at Cater nary Wire system of Coal Charging Car, Coke guide Car for KMCL-Coke Oven Complex, Duburi Orissa State
Client Name
: B.H.E.L ISG Bangalore
Completion /
Duration Period
:
24 Months Febryart,1989
Description
:
Transportation, Erection Commissioning of Electrical Equipment of Air Separation Unit at Visakhapatnam steel Project, Vizag
Project Name
:
Reliance Engg. Associate Pvt. Ltd
Completion /
Duration Period
:
80 Days March, 2001
Reference by
:
R.E.A.P.Ltd, Rajbhavan Road Somajiguda HYDERABAD
Description
:
Trenching and laying of ducts for Hyderabad city Net works for Reliance Engineering Associates PVT. Limited, Hyderabad
Client Name : BHEL, ISG,Bangalore
Completion /
Duration Period
: June, 2004 To December 2005
Reference by : Bharat Heavy Electricals Limited, ISG, II Sc Post Prof, C.N.R.Rao Circle Malleswaram BANGALORE
Description : Laying & Termination of Cables, Cable Trench, PVC Pipes, Laying, Erection of equipment etc for Seabird Project, Karwar, Karnataka State
Client Name : BHEL PS SR SAS SECUNDERABAD
Completion /
Duration Period
: JANUARY, 2000 TO March, 2000
Reference by : The Deputy General Manager (C&C) BHEL PS SR SAS 39, Sarojini Devi road
SECUNDERABAD-3 AP
Description : Andhra Pradesh State Electricity Board/Kottagudem Thermal Power Station-5 & 6 Units electrical restoration works of 6.6KV Switchgear Panels for 110MW K.T.P.S. Kottagudem, A.P.,
Client Name : BHEL,ISG,Bangalore
Completion /
Duration Period
: One Year February,2000
Description : Reaceipt of materials/equipments/cables etc., from NINL/BHEL Stores. Loading of materials on Trailor etc., transportation of equipment to the ertection site and ereaction of Panels, Transformers, Switchboards, control desks, control panels/Boxes etc., for RMHS, DUBRI, Jajpuur
Client Name : B.H.E.L PS SR -SAS
Completion /
Duration Period
: 25 days September,1993
Reference by : The Manager, Planning B.H.E.L PS SR SAS 39, Sarojini Devi Road SECUNDERABAD AP
Description : Naively Lignite Corporation-TS Naively (NLC-TS)Unit VII-100MW Generator Stator Partial rewinding at NLC, Naively, Thamilnadu
Client Name : BHEL, ISG, Bangalore
Completion /
Duration Period
: July, 2004 To December, 2005
Reference by : Bharat Heavy Electricals Limited, ISG, II Sc post Prof. C.N.R.Rao Circle Malleswaram BANGALORE
Description : Electrical Erection, Testing and rendering of Commissioning Assistance to BHEL Engineers at BWSSB WTP Automation Project, T K Halli, BANGALORE
Client Name : BHEL SXX BHOPAL
Completion /
Duration Period
: Two year January, 1996
Reference by : The Dy. General Manager B.H.E.L SXX Division B.H.E.L Post, BHOPAL
Madhya Pradesh
Description : Erection, Commissioning of 6.6KV Switchgear at Vijayawada thermal Power Station, stage-III
Client Name : B.H.E.L ISG Bangalore
Completion /
Duration Period
: March, 1998 To October, 1999
Reference by : The Deputy general Manager(E&C) B.H.E.L ISG 25/1 MG Road Bangalore-500 001
Karnataka
Description : Transportation of Equipments like 33KV/11KV/6.6KV Power Transformers, HT Panels, sub-station Panel, MCC’s, PCC’s iIlumination System, Cable Laying . End Terminations, structural items and connected equipment/material etc., from Reliance Petroleum’s Limited, Stores to Erection site at Jamnagar, Gujarat.
Client Name : BHEL SXX BHOPAL
Completion /
Duration Period
: Feb, 1995 To Aug, 1995
Reference by : Executive Engineer (R&M) Rihand Power Station Utter Pradesh Jal Vidyut Nigam Limited, PIPRI, Dist Sonebhadra
Description : Dismantling, Rectification, renovation and Re-erection and supply of spare parts of 50 MW Hydro Machine No.3 of Rihand Power Station, PIPRI, Sonebhadra, Utter Pradesh
Client Name : BHEL -PGS
Completion /
Duration Period
: 1 Months
Reference by : The R.S.M. B.H.E.L PGS, 39, Sarojini Devi Road, Secunderabad
Description : Modifications and Erection of Coal/Air/Vapor Burners of unit no ii 60MW Boiler at Ennore Thermal Power Station, Chennai
Client Name : BHEL -PGS
Completion /
Duration Period
: 3 Months
Reference by : The R.S.M. B.H.E.L PGS, 39, Sarojini Devi Road, Secunderabad
Description : Ennore Thermal Power station 110MW Unit no.V Overhauling and assembly of Turbo Alternate at Set at ETPS, Ennore, Chennai
Project Name
:
BHEL,ISG,Bangalore
Completion /
Duration Period
:
One Year February,2000
Reference by
:
Bharat Heavy Electricals Limited, ISG, II Sc Post Prof. C.N.R.Rao Circle Malleswaram BANGALORE
Description
:
Reaceipt of materials/equipments/cables etc., from NINL/BHEL Stores. Loading of materials on Trailor etc., transportation of equipment to the ertection site and ereaction of Panels, Transformers, Switchboards, control desks, control panels/Boxes etc., for RMHS, DUBRI, Jajpuur
Client Name : B.H.E.L- S & S
Completion /
Duration Period
: 45 Days
Reference by : The R & M, B.H.E.L S & S.33-A, Chow ran ghee Road, Calcutta
Description : Overhauling and Rectification of Generator, Condenser and Coolers of 110MW Thermal unit of Talcher Thermal Power House, ORISSA
Client Name : BHEL -PGS
Completion /
Duration Period
: 75 Days
Reference by : The R.S.M. B.H.E.L PGS, 39, Sarojini Devi Road, Secunderabad
Description : Ennore Thermal Power station 110MW Unit no.IV Overhauling and assembly of Turbo Alternate set Ennore, Chennai
Client Name : BHEL PS SR -SAS
Completion /
Duration Period
: 110 Days
Reference by : The Manager, Planning B.H.E.L PS -SR- SAS 39, Sanogini Devi Road
SECUNDERABAD AP.
Description : Ennone Thermal Power Station 110 MW. Unit no.IV assistance for re-winding of Generator Stator including Fabrication of class room etc at Ennore Thermal power Station Ennone, Chennai
Client Name : BHEL,ISG,Bangalore
Completion /
Duration Period
: Sept, 2005 To May, 2007
Reference by : Bharat Heavy Electricals Limited, ISG, II Sc Post Prof.C.N.R.Rao Cirecle Malleswaram, Bangalore.
Description : Erection and Commissioning work of Electrical Power Supply System for Seabird project of Indian Navy Karwar, Karnataka
Client Name : B.H.E.L PS SR -SAS
Completion /
Duration Period
: 11 MONTHS Feb.1993
Reference by : The Manager, Planning B.H.E.L PS SR SAS 39, Sarojini Devi Road SECUNDERABAD AP
Description : Sholeyer Hydro electric Project KSEB. 18 MW unit
a) Generator Stator Core building and winding
b) Dismantling of existing Generator and re-assembly with new stator and commissioning
Project Name
:
Fowler Westrup India Limited
Completion /
Duration Period
:
6 Months November,2001
Reference by
:
The Managing Director Fowler Westrup (I) Ltd., Bommasandar industrial Area BANGALORE-562158
Description
:
Supply of Main incoming cables and illumination system installation system, installation and commissioning of the same and construction of stores at site, supply of skilled and semi skilled Man power at PHI Medchel, R.Reddy dist, AP