M/S.TVR PROJECTS PRIVATE LIMITED
(FORMERLY VIJAYA ENGINEERS & CONTRACTORS)
VISAKHAPATNAM
LIST OF JOBS BEING EXECUTED:
M/S.TVR PROJECTS PRIVATE LIMITED
(FORMERLY VIJAYA ENGINEERS & CONTRACTORS)
VISAKHAPATNAM
LIST OF JOBS BEING EXECUTED:
Client Name
|
: | U.P Jal Vidyut Nigam Limited |
Completion /
Duration Period
|
: | JUNE, 1979 TO JULY, 1982 |
Description
|
: | Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP. |
Client Name | : | M/S Bhanu Constructions Company |
Completion / Duration Period |
: | 12th July, 1982 |
Description | : | Erection of Sub-Station equipment including cabling and lighting |
Client Name | : | U P Jal Vidyut Nigam Limited |
Completion / Duration Period |
: | 4 Months Oct, 1981 |
Description | : | Overhauling of LT Motors, Condenser Pumps, HT Motors, E.S.P and Rectifier Transformers of E.S.P of OBRA Thermal Power Station UPSEB. |
Client Name | : | U P Jal Vidyut Nigam Limit |
Completion / Duration Period |
: | 6 Months June, 1985 |
Description | : | Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associated auxiliaries at Rihand Power station UP Jal Vidyut Nigam Ltd. U.P |
Client Name | : | U P Jal Vidyut Nigam Limit |
Completion / Duration Period |
: | 9 Months |
Description | : | Supply, Dismantling, Rectification and Erection of 22 nos of stop Log Gates at Rihand Hydro Power Station, Pipri, U.P |
Client Name | : | U P Jal Vidyut Nigam Limit |
Completion / Duration Period |
: | 90 Days April, 1990 |
Description | : | Capital Overhauling of 2 Nos 90 M Tons EOT Crane alignment and leveling RHPS, PIPRI, U.P |
Client Name | : | U.P. Jal Vidyut Nigam Ltd |
Completion / Duration Period |
: | August, 1988 To July, 1992 |
Description | : | Dismantling , Rectification, re-erection of intake Gates re-alignment of Guide Track, cleaning and painting of all 6 Units each 50MW at Rihand Hydro Power Station, PIPRI, U.P. Jal Vidyut Nigam Ltd. UP. |
Client Name | : | U.P. Jal Vidyut Nigam Ltd. |
Completion / Duration Period |
: | 6 Months |
Description | : | Dismantling, Overhauling special Rectification of Unit No.3 and 12 Nos of Stop Log Gates at Obra Hydel Power house, OBRA, U.P. Jal Vidyut Nigam Ltd. UP. |
Client Name | : | Tamilnadu Electricity Board Ennore, Chennai |
Completion / Duration Period |
: | 3 Months February, 1999 |
Description | : | E T P S- Turbine Division-Dismantling, Rectification and Re-erection of 2 Nos Boiler Feed Pump of Unit-V, 110 MW |
Client Name | : | Utter Pradesh Jal Vidyut Nigam Limited, |
Completion / Duration Period |
: | 25 Days 30.06.2000 |
Description | : | Re-alignment of Rails and Overhauling of 90 x 2 MT E.O.T Crane at Rihand Power Station, PIPRI Sonebhadra Dist., U.P. |
Client Name | : | U.P J V N Limited Obra |
Completion / Duration Period |
: | 90 Days May,2000 |
Description | : | Dismantling, Rectification/Overhauling and Re-erection of , Boiler Feed Pumps 2 Nos & its Auxiliaries for Unit No.8 of 200 Mw at Obra Thermal Power station, UP J V N Limited OBRA |
Client Name | : | U.P J V N Limited PIPRI |
Completion / Duration Period |
: | 3 Months Sept., 2000 |
Description | : | Capital Overhauling of Unit No.4 (50 MW English Electric Make) Turbine Generator and its Auxiliaries at Rihand Hydro Power Station, PIPRI, U.P |
Client Name | : | UP J V N Limited PIPRI |
Completion / Duration Period |
: | 90 Days October,2000 |
Description | : | Dismantling, Rectification and re-assembly of intake gate of Machine No.4 & Changing of Rubber Seals of 22 Nos Stop Log Gates and dropping them in “C” guides of Unit No.4 |
Client Name | : | UP J V N Limited PIPRI |
Completion / Duration Period |
: | 3 Months October, 2000 |
Description | : | Overhauling of 60 MVA Transformer and Overhauling of 100 MT Gantry Crane on DAM TOP including re-alignment of Rails etc, at Rihand Hydro Power Station PIPRI, Dist Sonebhadra Utter Pradesh |
Client Name | : | WEIR Pumps Limited U.K |
Completion / Duration Period |
: | One Month April, 2002 |
Description | : | Manufacture and Supply of OFF-SKID, Pipes for Unit No.3 & 4 of Tarapur Atomic Power Project, Tarapur, Maharastra State |
Client Name | : | U.P.Jal Vidyut Nigam Limited |
Completion / Duration Period |
: | 20 Days February, 2002 |
Description | : | Dismantling and lifting of Generator Shaft of Machine No.4 from its coupling after properly wedging the runner of the turbine and keeping the same at Unit No.4 of RPS, PIPRI, U.P |
Client Name | : | U.P.Jal Vidyut Nigam Limited |
Completion / Duration Period |
: | 70 Days March, 2002 |
Description | : | Repairing of 6 Nos. Draft Tube gates and fixing of Rubber Seals (supplied by department) on gates as per specification complete in all respect at RPS, Pipri, U.P |
Client Name | : | Dolphin Engg.Enterprise |
Completion / Duration Period |
: | August, 2003 To December 2003 |
Description | : | RCC Structures, RCC Basin, Stair Case, supply of materials, labour & construct8ion of 3 cell RCC COOLING Tower of M/s.Konark Power project Limited, Tumukuru, Karnataka State |
Client Name | : | RINL Visakhapatnam |
Completion / Duration Period |
: | March, 2009 to May, 2009 |
Description | : | Erection ,Testing & Commissioning of External and internal Electrification works for Agro forestry building Complex at Ukkunagaram in Visakhapatnam Steel Plant |
Client Name | : | RINL Visakhapatnam |
Completion / Duration Period |
: | Nov, 2009 to JAN, 2010 |
Description | : | Installation, Testing & Commissioning to all equipment for Power Wiring For Access Control System at Expansion Gate in Visakhapatnam Steel Plant |
Client Name | : | C & S Bangalore |
Completion / Duration Period |
: | March, 2006 To May, 2006 |
Description | : | Erection of BTS AT Seabird Project,Karwar, Karnataka |
Client Name | : | WEIR Engg. Services (i) Ltd. |
Completion / Duration Period |
: | Autust,2002 To December, 2005 |
Description | : | Erection of the boiler Feed Pump (with Motor) units along with auxiliary equipments at NPCIL, Tarapur Unit no.3 |
Client Name | : | Euro Coke & Energy Pvt. Ltd., |
Completion / Duration Period |
: | June, 2004 To December,2005 |
Description | : | Supply and Erection of Electrical equipment, instrumentation and automation package for the Coke Oven Plant at, Jindal Vijayanagar Steels, Toranagallu, Bellary Dist. Karnataka State |
Client Name | : | Hycon Infrastructure Ltd |
Completion / Duration Period |
: | Sept. 2004 to August, 2005 |
Description | : | Providing lighting along Road including Parks at Visakhapatnam to Bheemili Beach Road for VUDA Visakhapatnam |
Project Name
|
: | Tata Teleservices Limited |
Completion /
Duration Period
|
: |
6 Months May, 2001 To October, 2001
|
Description
|
: |
Civil, Electrical, Power implementation Cable trays and Poles for Antena works for Limited Mobility Site & Concentrator Site works at Visakhapatnam, Kakinada, Rajahmundry of AP
|
Project Name
|
: | TTL Hyderabad |
Completion /
Duration Period
|
: |
Sept, 2005 to May, 2006
|
Description
|
: |
Provision of infrastructure facilities for Cell sites and repeater sites in A.P
|
Project Name
|
: | Reliance Engineering Associates Pvt Limited HYDERABAD |
Completion /
Duration Period
|
: |
60 Days March, 2001
|
Description
|
: |
Trenching and laying of Ducts for Hyderabad city net work |
Client Name
|
: | Visakhapatnam Steel Project |
Completion /
Duration Period
|
: |
4 Months February 1983
|
Description
|
:
|
Supply & installation and Commissioning of industrial Lighting Earthing & lighting Protection for fire Bridged Station of Visakhapatnam Steel Project, A.P
|
Client Name
|
: | Visakhapatnam Steel Project |
Completion /
Duration Period
|
: |
18 Months Novembers,1984
|
Description
|
: |
Supply, installation & Commissioning of Power, Lighting and Earthing works. 30 Nos of “D” type, 220 Nos. of “C” type Dwelling Units at Visakhapatnam Steel Project, Andhra Pradesh
|
Client Name
|
: | Visakhapatnam Steel project |
Completion /
Duration Period
|
: |
12 Months June, 1985
|
Description
|
: |
Erect ion of 11 KV Overhead lines, Sub-station ear things at Visakhapatnam Steel Project, Vizag
|
Client Name
|
: | Visakhapatnam Steel project |
Completion /
Duration Period
|
: |
12 Months June, 1985
|
Description
|
: |
Erect ion of 11 KV Overhead lines, Sub-station ear things at Visakhapatnam Steel Project, Vizag
|
Client Name
|
: | B.H.E.L ISG Bangalore |
Completion /
Duration Period
|
: |
12 Months August-1989
|
Description
|
: |
Erection, Testing and Commissioning of Electrical for Twin Boom Stackers & Trailer Unloader at Visakhapatnam Steel Project, Vizag
|
Client Name
|
: | B.H.E.L ISG Bangalore |
Completion /
Duration Period
|
: |
15 Months June, 1989
|
Description
|
: |
Transportation of the Equipment, erection & Providing Commissioning assistance for the Wire Rod mill Electrics at Vizag Steel Plant
|
Client Name
|
: | B.H.E.L ISG Bangalore |
Completion /
Duration Period
|
: |
7 Months
|
Description
|
: |
Receipt of material, Transportation Erection and rendering commissioning assistance for the Rail and Structural Mill- MG set replacement Billet and Blooming mill- MG Set Replacement Electrics and Blast Furnace 5 at Bhilai Steel Plant, SAIL, BHILAI, M.P
|
Client Name
|
: | B.H.E.L ISG |
Completion /
Duration Period
|
: |
3 YEARS March 1994
|
Description
|
: |
Receipt of material from Stores, Transportation of goods to erection site, storage at erection site, safe custody erection and providing required number of skilled personnels for Testing & Commissioning to BHEL Engineers for Assistance till the entire job in completion of MMSM at Visakhapatnam Steel Project, Visakhapatnam A.P
|
Client Name
|
: | B.H.E.L ISG |
Completion /
Duration Period
|
: |
3 YEARS March 1994
|
Description
|
: |
Erection of Earthing material at Visakhapatnam Steel Project in MMSM Project, Visakhapatnam
|
Client Name
|
: | B.H.E.L ISG |
Completion /
Duration Period
|
: |
6 months March, 1994
|
Description
|
: |
Labour Charges for Loading unloading and transport of equipment from BHEL Stores to site, Erection, Alignment, Pre-commissioning Traits & Final Commissioning of various Equipments in MMSM VSP, Visakhapatnam
|
Client Name
|
: | B.H.E.L ISG BANGALORE |
Completion /
Duration Period
|
: |
Two Years July, 1996
|
Description
|
: |
Receipt of Material, Transportation Erection and rendering Commissioning Assistance for the Hot Rolling and Stackel Mill at Salem steel Plant, SAIL, SALEM, Tamilnadu
|
Client Name
|
: | A.B.B LTD BANGALORE |
Completion /
Duration Period
|
: |
3 years December, 1997
|
Description
|
: |
Receipt of materials, Transportation, Erection and Commissioning of Electrical Equipment including Cable Laying and end Terminations at Continuous Casting Plant-II Rourkela Steel Plant , Rourkela , Orissa
|
Client Name
|
: | BHEL, ISG, Bangalore |
Completion /
Duration Period
|
: |
20 Days November, 1997
|
Description
|
: |
Revamping of D.C. Motors at Salem Steel Plant, Salem Tamilnadu
|
Client Name
|
: | ABB LTD BANGALORE |
Completion /
Duration Period
|
: |
9 Months December, 1998
|
Description
|
: |
UNLOADING, SHIFTING, TRANSPORATION & Dismantling, installation, Assistance in testing and commissioning of Electrical for CAL at CRM Project, Rourkela Steel Plant, Rourkela
|
Client Name
|
: | ABB LTD BANGALORE |
Completion /
Duration Period
|
: |
July, 1997 To January, 2000
|
Description
|
: |
Unloading, Shifting, Transportation & Dismantling, installation, Assistance in Testing and Commissioning of Electrics for Cold Reversing Mill-1 Picking line-II, Coil preparation line and Galvanizing line-1 etc works at Rourkela Steel Plant, SAIL Rourkela, Orissa.
|
Client Name
|
: | B.H.E.L ISG BangaloreA B B Limited Bangalore |
Completion /
Duration Period
|
: |
April, 1999 To September, 2000
|
Description
|
: |
Unloading, Shifting, Transportation & Dismantling, Installation, Assistance in testing and Commissioning of Electrics for Galvanizing Line-II, E.T.S.L.-II, and CAL etc., and miscellaneous works in CR-I, PL-II, CPL works of Rourkela steel Plant , SAIL Rourkela, Orissa
|
Client Name
|
: | RINL Vizag |
Completion /
Duration Period
|
: |
April, 2006 to September, 2006
|
Description
|
: |
Supply and Erection of Flood light towers and providing Street light pole form Old Appikonda Gate to New Appikonda gate at Visakhapatnam Steel Plant, Visakhapatnam
|
Client Name
|
: | RINL Vizag |
Completion /
Duration Period
|
: |
March, 2007 to August, 2007
|
Description
|
: |
Supply and Erection for “Upgradatiion of Electrical Installations at Zonal Site Offices for Additional facilities of 6.3 MT Expansion of Visakhapatnam Steel Plant, Visakhapatnam
|
Client Name
|
: | RINL VIZAG |
Completion /
Duration Period
|
: |
December, 2007 WORK-IN-PROGRESS
|
Description
|
: |
Design , manufacture, Supply and Erection of Electrics for Gas Booster for fourth Stream in Converter Gas Recovery Plant at Steel Melting Shop of Visakhapatnam Steel Plant |
Client Name
|
: | RINL Visakhapatnam |
Completion /
Duration Period
|
: |
March, 2009 to May, 2009
|
Description
|
: |
Erection ,Testing & Commissioning of External and internal Electrification works for Agro forestry building Complex at Ukkunagaram in Visakhapatnam Steel Plant
|
Client Name
|
: | RINL Visakhapatnam |
Completion /
Duration Period
|
: |
March, 2009 to May, 2009
|
Description
|
: |
Supply of External and internal Electrification works for Agro forestry building Complex at Ukkunagaram in Visakhapatnam Steel Plant
|
Project Name
|
: | U.P Jal Vidyut Nigam Limited |
Completion /
Duration Period
|
: |
JUNE, 1979 TO JULY, 1982 |
Description
|
: |
Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP.
|
Project Name
|
: | U.P Jal Vidyut Nigam Limited |
Completion /
Duration Period
|
: |
JUNE, 1979 TO JULY, 1982 |
Description
|
: |
Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP.
|
:
Client Name
|
: | Andhra Cement Company |
Completion /
Duration Period
|
: |
25 Months December,1987
|
Client Name
|
: | Asea Brown Boveri Limited, Bangalore |
Completion /
Duration Period
|
: |
December, 2008 to Work-in-progress
|
Description
|
: |
Erection and Commissioning services for Dalmia Cements Limited, Ariyalur, Trichi, Tamilnadu State
/div> |
Client Name
|
: | HPCL Vizag |
Completion /
Duration Period
|
: |
April, 2006 To Feb, 2007
|
Description
|
: |
Construction of Restrooms and Toilet facilities at HPCL petrol bunks in Costal Andhra Pradesh
|
Project Name
|
: | U.P Jal Vidyut Nigam Limited |
Completion /
Duration Period
|
: |
JUNE, 1979 TO JULY, 1982 |
Description
|
: |
Dismantling, rectification and re-erection of 50MW Hydro Turbine Generator and associate Auxiliaries at Rihand Power Station U.P. Jal Vidyut Nigam Ltd. UP.
|
Project Name
|
: | ABB LTD Pennya Bangalore |
Completion /
Duration Period
|
: |
March, 2009 To
|
Description
|
: |
C&I Erection of SJCL Project
|
Client Name
|
: | ABB LTD BANGALORE |
Completion /
Duration Period
|
: |
One year July, 1994
|
Description
|
: |
Receipt, Storage, Transportation, Erection & handling over of equipments listed in bill of materials section-1 for Bhilai Steel Plant, Wine Rod Mill revamp project in Bhilai steel plant, SAIL, BHILAI
|
Client Name | : | A.B.B LTD BANGALORE |
Completion / Duration Period |
: | March, 1998 To October, 1998 |
Reference by | : | The Senior Manager-ICO ABB LTD Peenya Industrial Area,BANGALORE- 560 058, Karnataka |
Description | : | Transportation of Equipments like 33KV/11KV/6.6KV Power Transformers, HT Panels, sub-station Panel, MCC’s, PCC’s Illumination System, Cable s, structural items and connected equipment / materials etc., from Reliance Petroleum’s Limited, Stores to Erection site at Jamnagar, Gujarat. |
Client Name
|
: | A.B.B LTD BANGALORE |
Completion /
Duration Period
|
: |
One year December, 1994
|
Description
|
: |
Erection of Equipments Cable Laying, Terminations and commissioning Assistance of M/s.Panchamahal steel Ltd, at KALOL, Gujarat State
|
Client Name | : | BHEL,ISG,Bangalore |
Completion / Duration Period |
: | March, 2004 To December, 2005 |
Reference by | : | Bharat Heavy Electricals Limited, ISG, II Sc Post Prof, C.N.R.Rao Circle Malleswaram BANGALORE |
Description | : | Receipt of Equipments materials spares at KMCL Storage, Erection of Panels, Electrics and control room equipments, rendering commissioning Assistance to BHEL Engineers at Cater nary Wire system of Coal Charging Car, Coke guide Car for KMCL-Coke Oven Complex, Duburi Orissa State |
Client Name
|
: | B.H.E.L ISG Bangalore |
Completion /
Duration Period
|
: |
24 Months Febryart,1989
|
Description
|
: |
Transportation, Erection Commissioning of Electrical Equipment of Air Separation Unit at Visakhapatnam steel Project, Vizag
|
Project Name
|
: | Reliance Engg. Associate Pvt. Ltd |
Completion /
Duration Period
|
: |
80 Days March, 2001
|
Reference by
|
: |
R.E.A.P.Ltd, Rajbhavan Road Somajiguda HYDERABAD
|
Description
|
: |
Trenching and laying of ducts for Hyderabad city Net works for Reliance Engineering Associates PVT. Limited, Hyderabad
|
Client Name | : | BHEL, ISG,Bangalore |
Completion / Duration Period |
: | June, 2004 To December 2005 |
Reference by | : | Bharat Heavy Electricals Limited, ISG, II Sc Post Prof, C.N.R.Rao Circle Malleswaram BANGALORE |
Description | : | Laying & Termination of Cables, Cable Trench, PVC Pipes, Laying, Erection of equipment etc for Seabird Project, Karwar, Karnataka State |
Client Name | : | BHEL PS SR SAS SECUNDERABAD |
Completion / Duration Period |
: | JANUARY, 2000 TO March, 2000 |
Reference by | : | The Deputy General Manager (C&C) BHEL PS SR SAS 39, Sarojini Devi road SECUNDERABAD-3 AP |
Description | : | Andhra Pradesh State Electricity Board/Kottagudem Thermal Power Station-5 & 6 Units electrical restoration works of 6.6KV Switchgear Panels for 110MW K.T.P.S. Kottagudem, A.P., |
Client Name | : | BHEL,ISG,Bangalore |
Completion / Duration Period |
: | One Year February,2000 |
Description | : | Reaceipt of materials/equipments/cables etc., from NINL/BHEL Stores. Loading of materials on Trailor etc., transportation of equipment to the ertection site and ereaction of Panels, Transformers, Switchboards, control desks, control panels/Boxes etc., for RMHS, DUBRI, Jajpuur |
Client Name | : | B.H.E.L PS SR -SAS |
Completion / Duration Period |
: | 25 days September,1993 |
Reference by | : | The Manager, Planning B.H.E.L PS SR SAS 39, Sarojini Devi Road SECUNDERABAD AP |
Description | : | Naively Lignite Corporation-TS Naively (NLC-TS)Unit VII-100MW Generator Stator Partial rewinding at NLC, Naively, Thamilnadu |
Client Name | : | BHEL, ISG, Bangalore |
Completion / Duration Period |
: | July, 2004 To December, 2005 |
Reference by | : | Bharat Heavy Electricals Limited, ISG, II Sc post Prof. C.N.R.Rao Circle Malleswaram BANGALORE |
Description | : | Electrical Erection, Testing and rendering of Commissioning Assistance to BHEL Engineers at BWSSB WTP Automation Project, T K Halli, BANGALORE |
Client Name | : | BHEL SXX BHOPAL |
Completion / Duration Period |
: | Two year January, 1996 |
Reference by | : | The Dy. General Manager B.H.E.L SXX Division B.H.E.L Post, BHOPAL Madhya Pradesh |
Description | : | Erection, Commissioning of 6.6KV Switchgear at Vijayawada thermal Power Station, stage-III |
Client Name | : | B.H.E.L ISG Bangalore |
Completion / Duration Period |
: | March, 1998 To October, 1999 |
Reference by | : | The Deputy general Manager(E&C) B.H.E.L ISG 25/1 MG Road Bangalore-500 001 Karnataka |
Description | : | Transportation of Equipments like 33KV/11KV/6.6KV Power Transformers, HT Panels, sub-station Panel, MCC’s, PCC’s iIlumination System, Cable Laying . End Terminations, structural items and connected equipment/material etc., from Reliance Petroleum’s Limited, Stores to Erection site at Jamnagar, Gujarat. |
Client Name | : | BHEL SXX BHOPAL |
Completion / Duration Period |
: | Feb, 1995 To Aug, 1995 |
Reference by | : | Executive Engineer (R&M) Rihand Power Station Utter Pradesh Jal Vidyut Nigam Limited, PIPRI, Dist Sonebhadra |
Description | : | Dismantling, Rectification, renovation and Re-erection and supply of spare parts of 50 MW Hydro Machine No.3 of Rihand Power Station, PIPRI, Sonebhadra, Utter Pradesh |
Client Name | : | BHEL -PGS |
Completion / Duration Period |
: | 1 Months |
Reference by | : | The R.S.M. B.H.E.L PGS, 39, Sarojini Devi Road, Secunderabad |
Description | : | Modifications and Erection of Coal/Air/Vapor Burners of unit no ii 60MW Boiler at Ennore Thermal Power Station, Chennai |
Client Name | : | BHEL -PGS |
Completion / Duration Period |
: | 3 Months |
Reference by | : | The R.S.M. B.H.E.L PGS, 39, Sarojini Devi Road, Secunderabad |
Description | : | Ennore Thermal Power station 110MW Unit no.V Overhauling and assembly of Turbo Alternate at Set at ETPS, Ennore, Chennai |
Project Name
|
: | BHEL,ISG,Bangalore |
Completion /
Duration Period
|
: |
One Year February,2000
|
Reference by
|
: |
Bharat Heavy Electricals Limited, ISG, II Sc Post Prof. C.N.R.Rao Circle Malleswaram BANGALORE
|
Description
|
: |
Reaceipt of materials/equipments/cables etc., from NINL/BHEL Stores. Loading of materials on Trailor etc., transportation of equipment to the ertection site and ereaction of Panels, Transformers, Switchboards, control desks, control panels/Boxes etc., for RMHS, DUBRI, Jajpuur
|
Client Name | : | B.H.E.L- S & S |
Completion / Duration Period |
: | 45 Days |
Reference by | : | The R & M, B.H.E.L S & S.33-A, Chow ran ghee Road, Calcutta |
Description | : | Overhauling and Rectification of Generator, Condenser and Coolers of 110MW Thermal unit of Talcher Thermal Power House, ORISSA |
Client Name | : | BHEL -PGS |
Completion / Duration Period |
: | 75 Days |
Reference by | : | The R.S.M. B.H.E.L PGS, 39, Sarojini Devi Road, Secunderabad |
Description | : | Ennore Thermal Power station 110MW Unit no.IV Overhauling and assembly of Turbo Alternate set Ennore, Chennai |
Client Name | : | BHEL PS SR -SAS |
Completion / Duration Period |
: | 110 Days |
Reference by | : | The Manager, Planning B.H.E.L PS -SR- SAS 39, Sanogini Devi Road SECUNDERABAD AP. |
Description | : | Ennone Thermal Power Station 110 MW. Unit no.IV assistance for re-winding of Generator Stator including Fabrication of class room etc at Ennore Thermal power Station Ennone, Chennai |
Client Name | : | BHEL,ISG,Bangalore |
Completion / Duration Period |
: | Sept, 2005 To May, 2007 |
Reference by | : | Bharat Heavy Electricals Limited, ISG, II Sc Post Prof.C.N.R.Rao Cirecle Malleswaram, Bangalore. |
Description | : | Erection and Commissioning work of Electrical Power Supply System for Seabird project of Indian Navy Karwar, Karnataka |
Client Name | : | B.H.E.L PS SR -SAS |
Completion / Duration Period |
: | 11 MONTHS Feb.1993 |
Reference by | : | The Manager, Planning B.H.E.L PS SR SAS 39, Sarojini Devi Road SECUNDERABAD AP |
Description | : | Sholeyer Hydro electric Project KSEB. 18 MW unit a) Generator Stator Core building and winding b) Dismantling of existing Generator and re-assembly with new stator and commissioning |
Project Name
|
: | Fowler Westrup India Limited |
Completion /
Duration Period
|
: |
6 Months November,2001
|
Reference by
|
: |
The Managing Director Fowler Westrup (I) Ltd., Bommasandar industrial Area BANGALORE-562158
|
Description
|
: |
Supply of Main incoming cables and illumination system installation system, installation and commissioning of the same and construction of stores at site, supply of skilled and semi skilled Man power at PHI Medchel, R.Reddy dist, AP
|